READY FOR YOUR FIRST SHOT
Be ready before the technician arrives. Select your model, review the available specifications and coordinate preparation with our technical team.
Purchased modelSelect your machine model ZERO PLUS BARISTA XT BARISTA XT CLASSIC ICON EVO2 MINA BARISTA MINA CLASSIC STUDIO ONE DC TWO DC ONE MAX EDGE Machine versionSelect a version 2-group standard 3-group standard 2-group High 3-group High
ICON Select a machine version to see its precise specifications. The installation work sheet still requires approval. The dimensions above describe the machine itself, not the minimum counter length and width. Service clearance, load capacity, drilling plan, water pressure and treatment, drainage and electrical circuit requirements must be confirmed for the version purchased. Completing this checklist alone does not authorise installation or dispatch.
Available reference and limits of use This revision shows 250 mm of service clearance on both sides, behind and above the machine. Its applicability to your current version must be confirmed. Do not use this figure to build the counter without matching the version.
ICON manual · Revision 04/2022 ↗ Pre-installation coordination checklist Ticks are for your own review only. They are not saved here or sent to the company. Use your browser's print or save-as-PDF function to keep a copy.
Exact model and version Match the model, group count, standard or high version and a photograph of the rating plate to your order. Do not transfer specifications between machine generations.
Counter and positioning Prepare a level, water-resistant surface capable of supporting the ready-to-use machine and associated equipment. Allow for service access around and above it, grinder space and handle movement. Final counter dimensions depend on approval of the exact version's layout.
Service routing Counter-hole position and size, and access below the counter, must follow an approved drawing for that machine. Do not drill the counter before technical team approval.
Water and treatment Check the water supply type (tank or mains), inlet pressure and water quality. For a mains connection, provide cold potable water and an accessible shut-off valve. Filtration and softening must be selected using water-test results and the exact machine's instructions.
Drainage Confirm drainage requirements, routing, connection dimensions and trap arrangements with the technician. The drain must not be blocked or pressurised. Do not use older-generation specifications to plumb a new version.
Electricity and safety A qualified electrician must match voltage, phases, earthing, circuit protection and the appropriate cable or connection to the rating plate and local regulations. Catalogue power alone is not sufficient to select a socket, cable or fuse. Customers must not connect or modify wiring themselves.
Access and handover Check the delivery route, door widths, lift, final position and access to the water valve and electrical isolator. The site must allow the technician to work safely.
Coordination before dispatch Send photographs of the counter and utilities, order details and unresolved questions to the service team. The visit is arranged after site readiness has been reviewed and approved by the technical team.